Files
EDSS-calc/PROJECT_STRUCTURE.md
2026-05-19 10:03:52 +02:00

832 B

Project Structure

This project was reorganized into:

  • data/

    • raw/: original raw data, if retained locally
    • processed/: cleaned or derived input data
    • ground_truth/: manually annotated reference data
    • external/: externally provided data
  • prompts/

    • EDSS instructions and prompt/schema assets
  • scripts/

    • runnable analysis and plotting scripts
  • results/

    • benchmark_runs/: full model benchmark runs
    • final_results/: final selected model outputs
    • figures/: generated figures
    • tables/: generated tables
    • logs/: terminal logs
  • manuscript/

    • final figures and tables for paper/thesis writing
  • archive/

    • old scripts, old results, temporary files, and unclear legacy files

Important: The reorganization was performed after creating a full timestamped backup.